can't believe for one second there will be 750 lorries over a week. Almost 110 a day? I work in the construction industry and there's no way 750 would be correct.
The average end tipper lorry holds about 20 T of soil. The larger ones can hold 30 to 40, but would probably struggle to get down Floyd Rd.
2700/20 = 135 Lorries.
That's about 20 loads a day.
Usually on an earthworks project like this you have between 4 and 8 trucks running from site to tip and back all day long. How many loads each truck can shift each day depends on the distance between the source site and destination site. They might be doubling up and bringing in fill on the return leg.
20 loads a day is very do-able and although the residents will certainly notice its going on, there will be quiet spells between each truck.
Went down aldi today Saw a bloke in a charlton track suit looking at the back of the packet.....
Actuall while I was in there I bought one of those chimnea things. I have found a little plot down the garden threw some kindling in it and now I am sitting here aving a right old ponder.. £29 well spent,
Did think it was odd describing this as the largest building project since we returned to the Valley.
Wouldn't building any of the three stands have been bigger and especially shifting the old East terrace?
How much does a barrel of Napoleonic brandy weigh ?
Pretty much just the weight of the barrel, nearly all the brandy would have evaporated in 200 years. I must admit, happy though I am to answer your question, I fail to spot its relevance.
Red always fads more than any other colour,its something to do with the pigment in the paint.Red Cars always fade more than any other.
Those in the lower tier haven't
because those on the lower tier have had bums sitting on them every other week & thus polishing them for almost 2 hrs. The ones in the upper north never get sat on as the "geezers" are all standing up.
Comments
Wouldn't building any of the three stands have been bigger and especially shifting the old East terrace?
The average end tipper lorry holds about 20 T of soil. The larger ones can hold 30 to 40, but would probably struggle to get down Floyd Rd.
2700/20 = 135 Lorries.
That's about 20 loads a day.
Usually on an earthworks project like this you have between 4 and 8 trucks running from site to tip and back all day long. How many loads each truck can shift each day depends on the distance between the source site and destination site. They might be doubling up and bringing in fill on the return leg.
20 loads a day is very do-able and although the residents will certainly notice its going on, there will be quiet spells between each truck.
Actuall while I was in there I bought one of those chimnea things. I have found a little plot down the garden threw some kindling in it and now I am sitting here aving a right old ponder.. £29 well spent,
Well they would say that wouldn't they but it does have a nice ring to it.
Isnt that's called Fly tipping?
This is how The Valley looks today, compared to how it was on Monday morning... #cafc
busDigger.Why do they call it Grass Roots? its an annoying phrase