Follow the link below to see details of the plannining application for the new pitch at the Valley for next season, Includes undersoil heating and 3G to the pitch perimeter including the technical areas. The tender document is very interesting.
http://publicaccess.royalgreenwich.gov.uk:81/online-applications/applicationDetails.do?activeTab=documents&keyVal=_GRNW_DCAPR_76822
Comments
Change of use, perhaps we are no longer going to play hoofball.
Great for our slick one touch passing football
Under soil heating, in retrospect, it was surprising we never installed such a system during the PL years.
Seems to start w/c 19 May and finish W/C 7 July. Not sure if that includes the time it takes for the pitch to "bed in".
I'll have a bet on our first league game being away from home.
Presumably the mass removal of 1.5 metres of waste from the pitch can just be used to fill in the West Stand Car Park potholes.......
But seriously that looks like it should be an immaculate playing surface.