South Eastern have decided in their wisdom they’re only going to run Charing X trains at weekend on the Sidcup line from December.
As a result, no more looping of the Sidcup and Woolwich lines with Cannon St. Sad news for the peeps of Sidcup, Albany Park, Bexley and Crayford who used the loop on a Matchday.
Will mean more pressure on the London bound trains post game, but most importantly, no more ostrich and whatever spotting of the Slade Green Safari Park :-(
Comments
So what happens... Transport options get bloody reduced!!
https://youtu.be/7GsANB_KwZc
So for once I'm a happy bunny.
(500 yards between the stations at Catford? Behave! Must've moved them since I lived there)
You kept that quiet.
Having got used to it for my travel to the Valley it looks like I’m now back to “On the buses” with R.Varney.
Lets hope a certain P.Varney brings the smile back to my face because at the moment all things Charlton related look grim!
Engineering work is taking place between London Charing Cross and New Cross, closing some lines.
On Saturday - A limited service will run from London Cannon Street and London Bridge with most services diverted to run to / from London Victoria or Blackfriars.
Saturday:
Paddock Wood Line: Trains between London Charing Cross and Ramsgate / Dover Priory via Tonbridge will be diverted to run to and from London Victoria.
Hastings Line: Trains between London Charing Cross and Hastings will run to and from London Bridge and run non stop between London Bridge and Tonbridge via an alternative route. Trains which usually only run between London Charing Cross and Tunbridge Wells will not run.
Maidstone East line: Trains between London Charing Cross and Maidstone East will run from London Victoria, and call additionally at Bromley South.
Sole Street line: Trains between London Victoria and Dover Priory will be retimed and call additionally at Denmark Hill. . A reduced service of 2 trains each hour will run between London Victoria and Gillingham.
Bexleyheath Line: Services between London Cannon Street and Slade Green, and London Charing Cross and Dartford via Bexleyheath will not run. Services between London Victoria and Dartford via Bexleyheath will be retimed.
Woolwich Line: Trains between London Cannon Street and Gravesend via Woolwich will not run. Trains between London Cannon Street and Slade Green via Greenwich will be extended to run to & from Dartford. Additional trains will run between London Victoria and Dartford via Woolwich.
Grove Park Line: Trains between London Charing Cross and Sevenoaks will be diverted to run to and from London Victoria. Services between London Cannon Street and Orpington will not run.
Sidcup Line: Trains between London Charing Cross and Gravesend will run to and from London Victoria. A reduced service of 2 trains each hour will run between London and Dartford via Sidcup.
Hayes Line: Trains between London Charing Cross and Hayes will run from Blackfriars and will run every 30 minutes calling additionally at Elephant & Castle.
Additional trains will run between London Bridge and London Cannon Street.
https://www.southeasternrailway.co.uk/travel-information/live-travel-information/planned-engineering-work?date=2023-08-19#engineering-departure-board
Anybody know?
Like trains from Victoria going through Blackheath to Woolwich?
17/47 minutes past the hour Charlton to Blackheath.
https://www.thetrainline.com/